RYDE Pt. Reyes Station delight

Distance

68.51

miles

Bike Ride

CLIMB
4549 ft

RYDE Pt. Reyes Station delight
Begins in:
Corte Madera, CA, United States
Created By:
Hernan Carrillo
Description:
This is the medium length route for TEAM RYDE journey across the US. It starts at Golden gate Bridge, goes through quaint towns, redwoods, grassy fields, and to the town of Poit Reyes Station, where the riders turn around and back following the same route
Starts From:
other
Tags:
Bike Path Surface Creek Surroundings For Event For Group High Traffic Area Low Traffic Area Medium Difficulty Mountains Surroundings Road Surface Rolling Climb Contour Rural Area Scenic Surroundings Smooth Terrain Urban Area
Type:
Bike Ride

Share:

Map Options
       
Please wait while we load elevation data for this map.
Download Data Learn About Climb Ratings

Climb Details

Rating Start/End Points Length Start/End Elevation Avg Grade
Cat 5 0.93 mi/2.30 mi 1.37 mi 32 ft/227 ft 2.7%
Cat 5 8.15 mi/9.89 mi 1.74 mi -4 ft/298 ft 3.3%
Cat 3 13.13 mi/20.04 mi 6.91 mi 5 ft/562 ft 1.5%
Cat 5 29.87 mi/31.24 mi 1.37 mi 91 ft/335 ft 3.4%
Cat 5 34.29 mi/37.34 mi 3.05 mi 18 ft/335 ft 2.0%
Cat 5 44.37 mi/48.48 mi 4.11 mi 284 ft/560 ft 1.3%
Cat 5 55.45 mi/58.62 mi 3.17 mi 4 ft/298 ft 1.8%
Cat 4 60.36 mi/66.21 mi 5.85 mi -4 ft/227 ft 0.8%
Cat 5 67.58 mi/68.51 mi 0.93 mi 25 ft/149 ft 2.5%

Courses on Route

Get Support